FutureData Sdn Bhd brings together the expertise and resources of Cyclect Group and TSG Group. Cyclect Group, with over 8 decades of experience in sustainable engineering and maintenace solutions, will play a pivotal role in implementing cutting-edge technologies for green data centers. TSG Group, a diversified conglomerate in Sarawak, has transformative business in infrastructure, sustainable plantations, and real estate.
UTURE DATA PARK MASTERPLAN
District Conceptual Masterplan
Future Data park is the first and largest renewable energy Data Center Park in Sarawak. With 135 acres of land earmarked for data centers, the park provides scalability to discerning data center players. The site is zoned for industry, and has access to Sarawak energy Power Grid and water resources, both critical for the data center operations. The park will have dark fibre connectivity via BaSICS between Kuching, Batam & Singapore as well as SEA-H2X, a new submarine cable system that will connect Hong Kong SAR, China, Philippines, Thailand, East Malaysia and Singapore. It is well-position as a major alternative data center hub for the South-East Asia region. The dark fibre connectivity will provide low latency network connections to data centers in SEA Regional, especially Singapore. The park will be power progressively by 500MW renewable energy with most competitive tariff in the Malaysia and the region. The first data center within the park is expected to start construction in 2024.
500MW planned capacity over 135 acres. Phase 1 20-30MW to be launch in 2023. Future Phases is design modularly to accommodate various DC requirements from Typical 10MW to Hyperscale 100MW DCs.
PROJECT LOCATION
Excellent connectivity within 10 km radius
- Kuching international airport
- Major business centres
- Education hub
- Medical facilities
- Proposed ART Transit Station which connects the North-South Samarahan ART Line Adjacent to University of Sarawak and Sarawak Heart Centre areas (earmarked for education and medical hub of Kuching)